Leading Provider
Of Marine Exporting Services
Loading color scheme
In 2016 MIDTAP conducted Technical Modifications to an existing loading arm on MIDTAP pier to handle LPG vessels providing LPG needs to the local market and transport it through 20-inch diameter petroleum product pipeline (Dekheila port - MIDOR lab) to Petrogas company’s tanks with a total length of 20 km.