Leading Provider
Of Marine Exporting Services
Loading color scheme
№1/N
About our company
Working since 1997
MIDTAP Finances and Manages Infrastructure Projects of Storage Tanks, Petroleum Product Pipeline and Petroleum Coke Loading Facilities.
№1/N
About our company
Working since 1997
A Crude oil Pipeline was constructed with diameter 26 Inch and length 11.5 km from SUMID at SIDI -KREIR Terminal to MIDOR Refinery.
Two Pipelines were constructed with diameter 20 Inch and length 21 km each to transfer petroleum products (Gasoline, Diesel & Jet Fuel from MIDOR Refinery to MIDTAP Pier at Dekheila Port to be exported.
An Effluent Water Pipeline was constructed with diameter 16 Inch and 6.5 km length to dispose industrial wastewater from MIDOR Refinery to Nubarya drain .
№1/N
About our company
Working since 1997
One of MIDTAP achievements is the Pier at Dekheila Port (430m length, 40m width)used for handling Petroleum Products of MIDOR refinery. The Loading Pier can handle different capacities of vessels up to 50,000 DWT for high quality Petroleum Products and up to 25,000 DWT for the Petroleum Coke.
MIDTAP Pier was nominated for future expansions and was thus enlisted by the admiral navy in England International Ship and Port facility Security Code (ISPS) was attained by the Company, a code that contains detailed security-related requirements for governments.
One of Middle East Oil Tankage & Pipelies (MIDTAP) achievements is the Pier at Dekheila Port (430m length, 40m width)used for handling Petroleum Products of MIDOR refinery. The Loading Pier can handle different capacities of vessels up to 50,000 DWT for high-quality Petroleum Products and up to 25,000 DWT for the Petroleum Coke.
A Crude Oil Pumping Station was constructed to transfer Crude Oil from SUMID Terminal in SIDI -KREIR to MIDOR Refinery of Amreyah Free Zone.
A Crude oil Pipeline was constructed with diameter 26 Inch and length 11.5 km from SUMID at SIDI -KREIR Terminal to MIDOR Refinery.
Two Pipelines were constructed with diameter 20 Inch and length 21 km each to transfer petroleum products (Gasoline, Diesel & Jet Fuel from MIDOR Refinery to MIDTAP Pier at Dekheila Port to be exported.
47 Tanks inside MIDOR refinery plant for Crude Oil and Petroleum Products.
Engineer Ayman Roshdy ( July 2021 - August 2023)
Engineer Ayman Gamal Mohey Roshdy
Engineer Hesham Abdel Hamed El Bokl (since August 2023 and uptill now)
Engineer Hesham Abdel Hamed El Bokl
Engineer Sameh Fahmy (March 1997 - October 1999)
Engineer Sameh Fahmy
Engineer Maher Abaza (October 1999 - October 2007)
Engineer Maher Abaza
Engineer Hassan Saed - Managing Director - (October 1999 - December 2006)
Engineer Hassan Saed
Engineer Mostafa Adam - Managing Director - (December 2006 - February 2008)
Engineer Mostafa Adam
Engineer Tarek Elhadidy (February 2013 - April 2016)
Engineer Tarek Elhadidy
Engineer Mahmoud Badran (May 2008 - February 2013)
Engineer Mahmoud Badran
Engineer Tarek Elhadidy (February - May 2008)
Engineer Tarek Elhadidy
Engineer Khaled Abd-Elbadea (April 2016- August 2017)
Engineer Khaled Abd-Elbadea
Engineer Mohamed Salah Eldin Elsherbiny (August 2017 - May 2018)
Engineer Mohamed Salah Eldin Elsherbiny
Chemist Samir Rizk (May 2018 - March 2019)
Chemist Samir Rizk
Engineer Adel ELShowekh (April 2019 - December 2019)
Engineer Adel ELShowekh
Engineer Magdi Tawfik ( January 2020 - April 2021)
Engineer Magdi Tawfik
Tel : +2034460081 Fax: +2034460080
Tel : +20225384541/2 Fax: +20225384519
Tel : +2034500049/50 Fax: +2034460080
Tel : +203(2021222 /2020341) Fax: +2032021444
Ring road ,90th st., New Cairo ,Egypt